The members of the People’s Commission for Control over the Development of Jeruy site familiarized themselves with the construction of the second stage of the tailings dump of the gold extraction factory.
The members of the People’s Commission for Control over the Development of Jeruy site familiarized themselves with the construction of the second stage of the tailings dump of the gold extraction factory.
On August 8 this year, Ermat Dzhumayev, Presidential Plenipotentiary in Talas Region, visited Jeruy gold mine.
Viktor Berezhnov (electrolysis operator) and Ilya Borisychev (responsible technician) of the gold extraction factory Alliance Altyn LLC have got awards from the Ministry of Natural Resources, Environment and Technical Supervision of Kyrgyzstan.
To celebrate the Steelworker’s Day, Alliance Altyn organized a new sports contest for its staff.
Alliance Altyn has paid KGS18.6bn taxes to the budget of Kyrgyzstan since 2015 through May 2024.
April 22: Alliance Altyn together with its partners celebrated supreme track records of Talas athletes
April 19, 2024, Talas: Alliance Altyn, which is developing Jeruy site in Talas region, held a round table named Environmental Dialog: A Look into the Future.
The Russian Federation, together with Alliance Altyn LLC, has donated computers, office equipment, as well as student books and fiction literature to general schools of Talas region.
On April 9-11, Alliance Altyn organized Shot Plus software bootcamp used for engineering and simulation in drilling and blasting operations.
Alliance Altyn became an industrial partner of the Kyrgyz-Russian Slavic University. A memorandum of cooperation between the mining company and the university was signed today.