Work continues on the construction of the processing complex at the Jeruy production site. The pictures show:

  • Main facility of the Mill
  • Thickening and leaching area
  • Weightbridge
  • Large crushing body
  • Crushed ore storage gallery
  • Electrolysis and melting body
  • AD-5 intrasite road
  • Tailings dump site
  • Central assay lab
  • The HTS and reagent base warehouse. Contractor Baden Service
  • Construction of the maintenance shop
  • Construction of a shift camp at the mining and processing complex
  • The Mill substation with a 110/35 kV overhead line. Electrosila LLC. The facility was submitted to the State Commission
  • Interplot power supply. Upper cluster (LC) of the 35/6 kV MSS with 6 kV overhead lines in the size of 35 kVl. Contractor Mekhkolonna CESS. The work on the site has been completed
  • Interplot power supply. Нижний кластер. The lower cluster. 6 kV overhead line. Contractor Electrosila. The facility was submitted to the State Commission
  • Reconstruction of the 110/35/10 kV substation in Chat-Bazar. Contractor NK Energo. Reconstruction is completed, the facility was submitted to the State Commission
  • Construction of the central checkpoint with a parking lot. Contractor Decor