EN KG RU
The Bakubat Talas Fund, established by Alliance Altyn LLC, continues its systematic activities in the Talas region

The Bakubat Talas Fund, established by Alliance Altyn LLC, continues its systematic activities in the Talas oblast, covering all parts of the region. In March 2018 alone, several projects were completed in various areas, including support for education, health care, culture and law enforcement agencies.

 

In particular, at the end of March, the secondary school of Talas region named after K. Kaimov was given equipment and furniture for the computer class: computers in the amount of 10 sets, 2 printers, a projector, an interactive whiteboard, a laptop, computer desks, shelving. The school cafeteria has been renovated, new plastic windows, water heaters, sinks have been installed. The total cost of the project for the secondary school named after K. Kaimov was 500 thousand KGS.

 

In the same period, an ambulance was purchased, duly fitted out with necessary medical equipment and handed over to FDG #4 at the rural district of Dolono, which serves 5 villages in Talas district and the Manas Ordo national complex. 400 thousand KGS were spent on this project.

 

Renovation work was carried out in the building of Kindergarten No. 1 Narista in Bakay-Ata village of Bakay-Ata district. 860,000 KGS were allocated for this project, with all the money spent on renovation. Old windows and doors were dismantled in all rooms of the kindergarten, new plastic windows and doors were manufactured and installed. In the same area, a project to provide drinking water to the secondary school named after S. Kochorbayev in Tuito village was completed.

 

In Talas, the overhaul of the premises of the Talas Regional Public Association of Veterans of the War in Afghanistan took place, for which 350 thousand KGS were spent. For the Talas Fight Hall of national wrestling Kulatuu Er Taymash, the necessary sports equipment (sports mats) was purchased and installed for the total of 180 thousand KGS.  

 

2 projects were implemented in the Manas district: the old roof of the Manas Police Department building in Pokrovka village was disassembled and a new roof was installed. 389.8 thousand KGS were spent on these tasks. 260 thousand KGS were spent on improving the financial and technical base of the Manas district Department of Culture, for which modern musical equipment and instruments were purchased.

 

In Kara-Buura district, a lighting project was accomplished on the central streets of Suulu-Maimak, where 63 metal poles of street lighting with LED lamps were installed and electrical connections were made. In addition, the water supply network renovation project in the building of the local district administration has been completed. In total, more than 1 million KGS were spent on these projects in the Kara-Buura district.

 

In the near future, the Bakubat Talas Fund is planning to implement about 10 social projects for a total amount of 6,296,973 KGS.